Taiwan Explorer 台灣
東部East coast & Taroko East coast & Taroko東部 Taroko Gorge 太魯閣TAROKO GORGE太魯閣

Is Taroko Gorge 太魯閣 open? Trail and road status

Taroko Gorge is partially open: the visitor center, Chongde, Tianxiang, and short sections of the Lushui trails are open, while classic trails including Shakadang, Swallow Grotto, and Baiyang remain closed and Highway 8 runs on timed release windows. Checked .

Checked 5 min read

Banded white and grey marble cliffs rising from a green-grey river in Taroko Gorge
Photo: Balon Greyjoy, CC0 1.0

Live cameras 即時影像

Road camera frame: Suhua Highway, Highway 9Camera
Suhua Highway, Highway 9台9線 蘇花 Frame read Highway Bureau camera, OGDL 1.0
Live stream by the official channel on YouTube. Pressing play loads YouTube.

YouTube stream links checked 20:23 Taiwan time, 28 Nov.

See all Taipei freeway, mountain and east-coast frames on the live road cameras page.

Highway Bureau, Ministry of Transportation and Communications, 2026, provincial highway CCTV snapshots. The Open Data is made available to the public under the Open Government Data License, User can make use of it when complying to the condition and obligation of its terms. Open Government Data License.

Taroko trail reopenings, typhoon warnings, and checked Taiwan updates go straight to Taiwan Explorer on Telegram (@taiwanexplorerclub), at most two posts a day.

Taroko Gorge (太魯閣) is only partially open, and its classic trails remain shut following the earthquake of April 3, 2024 and subsequent typhoons. Visitors can enter specific areas including the visitor center, Chongde, Tianxiang, and short sections of the Lushui trails. Travel through the gorge on Provincial Highway 8 runs only in timed release windows, so you must check live road conditions on the morning of your trip.

The short answer for November 2026

In March, the Executive Yuan said the stretch from Shakadang to Swallow Grotto (砂卡礑至燕子口) was still seriously damaged and that repair work would continue step by step. The April 3, 2024 earthquake was followed by several typhoons, including Gaemi, Krathon, and Kong-rey, which made repair work harder. The road between Tianxiang and the Taroko entrance, about 17 km, was the most badly hit.

In a report dated May 23, 2026, the head of the park said the next two years are a sprint for post-disaster rebuilding, with the focus on the badly damaged Buluowan access road and the Baiyang Trail. The same May 2026 report said visitor numbers had returned to roughly pre-earthquake levels in the months after the Lushui Trail reopened in February, and that the Dekalun Trail to Datong and Dali drew many foreign visitors.

What is open now

On February 4, 2026, the park announced that parts of the Lushui (綠水) area had reopened, after the Highway Bureau moved the Tianxiang traffic control point east to Lushui. The park said the Lushui area is open in daytime only, from half past eight in the morning to four in the afternoon. The park stressed that Lushui is not fully open: only parts judged structurally stable are open, and visitors must not enter the blocked areas beyond.

  • Lushui Trail (綠水步道): Only the first 250 m is open. Visitors walk to the small suspension bridge and turn back, about 15 minutes each way.
  • Lushui-Wenshan Trail (綠水文山步道): Only the first 450 m is open, to a point called Tuoyouen, about 30 minutes each way.

From July 1, 2025, the park reopened the Taroko Terrace and visitor center, the Tianxiang recreation area (Tianxiang visitor center, Tabido Trail, and Xiangde Temple), and the Chongde recreation area. In March, the Executive Yuan said the Tianxiang recreation area was recovering, that a hotel in the gorge had reopened, and that hikers had returned to the Qianliyan Trail. In May 2026, the park head said mountain paths from the Dekalun Trail to Datong and Dali were the ones foreign visitors liked most. The Executive Yuan said in March that local villages at Dali and Datong were being restored and that the Qianliyan and Liwushan trails were reopening in turn.

What is still closed

The Shakadang and Swallow Grotto area was singled out in March as still seriously damaged; no reopening date was given. When the park announced the July 1, 2025 reopening, it listed the Shakadang Trail (砂卡礑), Swallow Grotto (燕子口), Buluowan terrace (布洛灣), Zhuilu Old Road, and the Tunnel of Nine Turns (九曲洞) as still under construction.

Other closed locations include:

  • Baiyang Trail (白楊): Collapsed in heavy rain, damaged a water pipe that supplies Tianxiang, and in 2026 entered the first of two recovery phases.
  • Buluowan: The Buluowan access road collapsed badly after Typhoon Kong-rey; the rebuilding budget is close to one hundred million NT dollars (1億元).
  • Tunnel of Nine Turns: The June 2026 Highway 8 notice still lists work zones at both portals of the Jiuqudong Tunnel, at 172.2 km and 173.5 km.
  • Changchun Shrine (長春祠): Remains under repair.

The park announcement of October 27, 2026 on permit trails said Mt. Qingshui and the Zhuilu Old Road would be announced later; no reopening date has been given for Shakadang, Swallow Grotto or Baiyang.

How Highway 8 works

Provincial Highway 8 through the gorge does not allow continuous transit. For June 2026, the Highway Bureau split Highway 8 from Dayuling to Taroko into Guanyuan-Tianxiang, open daily 06:30 to 16:30, and Tianxiang-Taroko entrance, released five times daily. Inside the gorge, the National Park Service of Taiwan notice listed the June 2026 release windows:

  • 06:30-08:00
  • 10:00-10:05
  • 12:00-13:00
  • 15:00-15:05
  • 17:00-18:00

In the gorge section the road is closed at night from 18:30 to 06:30, with a clearance period from 18:00 to 18:30 when vehicles may only leave. The control points are the west side of the Lushui Hydrological Bridge (169.5 km) and the east portal of Shakadang Tunnel. Westbound traffic uses Shakadang Tunnel, Xila'an Tunnel, and Changchun Tunnel.

Driving the full 74 km from Dayuling to Taroko, eastbound drivers should reach Tianxiang by 17:00, and westbound drivers should pass Shakadang Tunnel by 15:00. The Highway Bureau notes release periods may be delayed or canceled due to weather or emergencies, and publishes measures month by month. In September 2026, a roadbed gap at Huoranting (157.7 km) was repaired, with five daily release windows from September 2 to September 24. Check the real-time service or the Happy Highway app before traveling.

Trails that need a permit

The park announced via the National Park Service of Taiwan that permit-only routes in the Ecological Protection Area reopened from 00:00 on October 27, 2026, after Typhoon Champi. Existing applications are restored from the opening date, and original applicants do not need to apply again.

Mt. Pingfeng and Qilai North Peak reopen on December 1, 2026; Mt. Qingshui and the Zhuilu Old Road are to be announced later. The park warns that steep slopes are prone to landslides right after a typhoon or earthquake and asks hikers to watch for rockfall and collapsed ground.

Planning the day and what to do instead

The park advises visitors to go up early and come down early because of afternoon weather changes and remaining geological risk. The park opened Lushui so people waiting for road releases can walk and look around while they wait. On the coast, the Chongde recreation area is near the Qingshui Cliffs (清水斷崖).

Review getting around Taiwan to plan your regional connections, and keep typhoon season in Taiwan in mind during stormy periods. You can base in Hualien along the east coast, or plan a trip south to Kenting. For road status, call the Highway Bureau line at +886-3-9962683 or the Taroko Maintenance Section at +886-3-8610775.

Facts on this page were checked against official sources on . Hours, fares and trail status change: confirm on the day.